The sign is installed at the boundaries of the right-of-way in locations where the pipeline crosses highways, railways, and bodies of water, at overhead pipeline crossings over natural and artificial obstacles (on both sides), and at entry and exit points of the pipeline from compressor station, gas distribution station, and gas metering station sites, at a distance of 50 m from the fencing.
Republic of Kazakhstan, Aktau, industrial zone 3, site 2, KM GROUP production base
